
Intiveo 10x10 Custom Booth with Arch Entry
10 × 10 ft100% custom, rent it or buy it, same design and build quality. Install & dismantle included.
Washington, DC · Floor plan intelligence
What actually constrains a layout in this building: hall dimensions and clear heights, booth numbering conventions, dock and delivery access, rigging approvals, and the aisle rules the fire marshal enforces on site.
Halls
| Hall | Exhibit area | Ceiling | Notes |
|---|---|---|---|
| Hall A | 145,000 sq ft | 30 ft | Closest to the L Street entrance. |
| Hall B | 150,000 sq ft | 30 ft | Mid-block, frequently combined with Hall A. |
| Hall C | 150,000 sq ft | 30 ft | Mid-block standard hall. |
| Hall D | 128,000 sq ft | 30 ft | Closer to the 9th Street NW entrance. |
| Hall E | 130,000 sq ft | 30 ft | Furthest hall from L Street; used for overflow. |
Building totals: 2.3M sq ft (703,000 sq ft exhibit). Halls: Halls A, B, C, D, E.
Laying out the floor
Halls A-E are numbered as one continuous letter-and-aisle sequence, and shows involving cleared or government-adjacent exhibitors (AUSA) often publish a supplemental badge-zone map layered on top of the standard booth numbering for security screening purposes.
L Street NW and 9th Street NW each have separate loading docks, giving the building two independent marshalling points, a genuine advantage for large shows that can split inbound delivery by hall to cut wait times versus a single shared dock.
IATSE Local 22 handles rigging venue-wide; shows with cleared exhibitors or government attendees (AUSA) add security screening lead time to the standard hanging sign approval process, since rigging crews and equipment on those floors may need additional clearance.
DC fire code sets standard cross-aisle minimums, and for AUSA-scale events with active-duty and government attendance, the floor plan also has to account for Secret Service or motorcade-related access restrictions that can close Mt Vernon Place with little notice.
Teamsters Local 639, IATSE Local 22
Freeman is the dominant GC in DC.
Planning notes
CAD to interactive
The venue's facilities office issues a DWG backdrop spanning Halls A-E with both docks marked; Freeman overlays exhibitor booth plots, and AUSA-type shows layer a separate security-zone PDF over the standard floor plan for badge control.
Send the venue backdrop (DWG, DXF or PDF) plus your booth count, tier structure and sponsor commitments.
We plot booth polygons against the real column grid, docks and aisle rules above, then brand it to your show.
Inventory goes live for exhibitor and sponsor self-serve, and a project manager makes edits through move-in and show days.
Shows here
Every booth below is available as a custom rental for Walter E. Washington CC, designed, built, delivered, installed and dismantled by our own team. Same designs are available to buy outright.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.
Keep going
Preliminary quote within 1 hour. Detailed quote within 24 hours. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.
10-minute call for projects of $10,000 USD and up. 30-minute design strategy session for projects of $30,000 USD and up.