Planning tool
Show Services
Deadline Tracker
Advance-order deadlines are the cheapest discount in the exhibit business and the easiest to miss. Put your show date in below and every deadline back-calculates, ready to drop into your calendar.
Short answer
How far ahead should I book a trade show booth?
Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended. Send the show date with the brief and we confirm whether that window is realistic.
When should I confirm delivery and install?
Confirm the show, the footprint and the install window as soon as the space is held. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.
Short answer
The deadlines that matter run 20 weeks out to move-in day: design approval at 16 weeks, venue and fire-marshal submissions at 12, fabrication release at 10, discount show-services orders at 8, graphics files at 6, warehouse pre-build at 4, and advance-warehouse delivery at 2. Missing the 8-week services deadline typically costs 20 to 35% on electrical, rigging and internet.
Interactive tool · 8 min read
Interactive tracker
Your deadlines, back-calculated
Enter the first day of your show. Every order-by date below is derived from it, then export the lot to your calendar.
Pick a show date to generate the schedule.
The deadlines that cost money
| Deadline | Typical timing | Cost of missing it |
|---|---|---|
| Exhibitor manual released | 16 to 20 weeks out | You lose lead time on every deadline below |
| Hotel room block | 12 to 16 weeks out | Rack rates, often 40 to 80% higher, and a longer commute |
| Rigging drawings and approvals | 10 to 12 weeks out | Hanging sign refused on site, the whole visual anchor of an island booth |
| Discount electrical / internet / cleaning | 6 to 8 weeks out | 20 to 35% surcharge, more if ordered on the floor |
| Graphics files to print | 5 to 6 weeks out | Rush print fees, or plain panels at show open |
| Advance warehouse delivery window | 2 to 3 weeks out | Direct-to-show delivery, marshalling yard queues, higher venue services |
| Lead retrieval order | 2 to 4 weeks out | On-site pricing, or no scanner at all on a sold-out show |
Why the advance warehouse window matters most
Delivery to the advance warehouse means your crates are already in the building, on your target move-in day, in your booth space when your installers arrive. Direct-to-show delivery means a marshalling yard, a check-in window you do not control, and a crew standing idle at hourly rates while you wait.
The advance window usually opens 30 days before move-in and closes 7 to 10 days before. Hitting it is normally cheaper per hundredweight and always cheaper in labour.
How we track this for our clients
Every Traction X project runs against this exact work-back schedule with a named producer accountable for each date. You get the tracker whether or not you build with us, but if you do, we file the show-services orders, submit the rigging drawings and book the delivery windows for you.
Get a quote in 1 hour
Preliminary quote within 1 hour. Detailed quote within 24 hours. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.
10-minute call for projects of $10,000 USD and up. 30-minute design strategy session for projects of $30,000 USD and up.
FAQ
Frequently asked
When is the discount deadline for trade show electrical?+
Most general contractors set the advance-rate deadline 14 to 21 days before move-in, though many shows publish an earlier 'super saver' date around 45 days out. Ordering on the show floor typically costs 20 to 35% more than the advance rate, sometimes double.
How far in advance should I start planning a trade show booth?+
Twenty weeks for a custom build, and 10 to 12 weeks is the realistic floor for a custom rental. Anything tighter is possible with pre-engineered systems, but you lose the cheap moments to change the design and pay rush fees on print and delivery.
What is the advance warehouse deadline?+
The advance warehouse usually accepts delivery from 30 days before move-in until 7 to 10 days before, with late fees inside the final week. Delivery into that window is the single easiest way to reduce venue services cost and install-day risk.
Keep planning
More exhibitor resources
Budgeting tool
Trade Show Budget Template
Every real line item, space, booth, electrical, travel and staff, in one worksheet that totals as you type.
Production reference
Booth Graphic File Specs
Bleed, safe area, resolution and colour profile for every panel type we print, plus finished sizes by footprint.
Business case tool
Trade Show ROI Calculator
Turn booth spend into cost per lead, break-even deal count and projected pipeline, the page you forward to finance.
Playbook
Booth Staffing & Lead Capture Playbook
Staffing ratios, shift schedules, opening lines, a qualifying script and the 48-hour follow-up sequence.
Get a quote in 1 hour
Anything you see online is a starting range only. Send us your show, footprint and dates. Preliminary quote within 1 hour. Detailed quote within 24 hours. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.