
Sidapharm 10x10 Reception Counter Booth
10 × 10 ft100% custom, rent it or buy it, same design and build quality. Install & dismantle included.
San Francisco, CA · Floor plan intelligence
What actually constrains a layout in this building: hall dimensions and clear heights, booth numbering conventions, dock and delivery access, rigging approvals, and the aisle rules the fire marshal enforces on site.
Halls
| Hall | Exhibit area | Ceiling | Notes |
|---|---|---|---|
| Moscone North | 180,000 sq ft | 30 ft | Underground hall beneath Yerba Buena Gardens. |
| Moscone South | 270,000 sq ft | 30 ft | Largest hall; primary floor for Dreamforce and RSA. |
| Moscone West | 58,000 sq ft per level across multiple floors | 24-30 ft | Multi-story building with meeting rooms above exhibit space. |
Building totals: 504,000 sq ft exhibit (Moscone North, South, West). Halls: Moscone North, South, West.
Laying out the floor
Numbering carries the building code (N, S, W) with West's multi-floor layout adding a floor-level digit that isn't needed in the single-level North and South halls, so a West Hall booth number tells you the floor before you even check the plan.
Howard Street and Third Street docks serve North/South respectively, with targeted move-in scheduling for large shows; Moscone West's multi-story layout means delivery for upper floors routes through a dedicated delivery elevator rather than a ground dock.
IATSE Local 16 handles all rigging; engineered drawings are required 45-60 days ahead of move-in, and Moscone West's floor-by-floor structure means each level above ground needs its own hang-point plot rather than one plan for the whole building.
San Francisco Fire Department enforces standard cross-aisle minimums with added scrutiny at Moscone West given its multi-floor layout, where each floor's egress to the stairwells and elevators must be validated independently rather than as one continuous hall.
Teamsters Local 2785, IATSE Local 16
Freeman is the primary GC for most Moscone shows.
Planning notes
CAD to interactive
Freeman issues separate DWG backdrops per building, with Moscone West split further by floor level; the exhibitor's booth plot must specify which West floor it targets before Freeman merges it into the master ceiling and floor plan.
Send the venue backdrop (DWG, DXF or PDF) plus your booth count, tier structure and sponsor commitments.
We plot booth polygons against the real column grid, docks and aisle rules above, then brand it to your show.
Inventory goes live for exhibitor and sponsor self-serve, and a project manager makes edits through move-in and show days.
Shows here
Every booth below is available as a custom rental for Moscone, designed, built, delivered, installed and dismantled by our own team. Same designs are available to buy outright.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.
Keep going
Preliminary quote within 1 hour. Detailed quote within 24 hours. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.
10-minute call for projects of $10,000 USD and up. 30-minute design strategy session for projects of $30,000 USD and up.