
GSTS 10x10 Reception Counter Booth
10 × 10 ft100% custom, rent it or buy it, same design and build quality. Install & dismantle included.
Atlanta, GA · Floor plan intelligence
What actually constrains a layout in this building: hall dimensions and clear heights, booth numbering conventions, dock and delivery access, rigging approvals, and the aisle rules the fire marshal enforces on site.
Halls
| Hall | Exhibit area | Ceiling | Notes |
|---|---|---|---|
| Building A | 400,000 sq ft | 30 ft | Closest to Mercedes-Benz Stadium; primary heavy-delivery access. |
| Building B | 600,000 sq ft | 30 ft | Largest single building, used for IPPE's core show floor. |
| Building C | 500,000 sq ft | 30 ft | Connects to Thomas Murphy Ballroom for meeting overflow. |
Building totals: 1.5M sq ft exhibit. Halls: Buildings A, B, C + Thomas Murphy Ballroom.
Laying out the floor
Numbering carries a building letter prefix (A, B, or C) with aisles numbered sequentially from the building's main entrance concourse, and IPPE-scale shows spanning all three buildings publish a single cross-reference index so exhibitors can find their building before hunting for a booth number.
Building A carries the heaviest delivery access for agricultural and processing equipment typical of IPPE, while B and C use standard dock aprons, organizers routing heavy machinery should confirm Building A availability early since it books out fastest.
Edlen is the exclusive electrical contractor and CCLD Networks is the exclusive internet and telephone provider. Hang-point approval still needs a plot review before hang day. Traction X files the power, data, and rigging orders.
Georgia's right-to-work status doesn't change fire code: Atlanta Fire Rescue enforces the same 10 ft cross-aisle minimum, with wider aisles mandated at the MARTA-adjacent north concourse where transit riders funnel directly onto the show floor.
Right-to-work; non-union labor available
Freeman & Shepard primary GCs.
Planning notes
CAD to interactive
GWCC's facilities team distributes DWG backdrops per building through the show's GC (Freeman or Shepard), and for multi-building shows like IPPE a combined index PDF cross-references booth numbers to building and aisle.
Send the venue backdrop (DWG, DXF or PDF) plus your booth count, tier structure and sponsor commitments.
We plot booth polygons against the real column grid, docks and aisle rules above, then brand it to your show.
Inventory goes live for exhibitor and sponsor self-serve, and a project manager makes edits through move-in and show days.
Shows here
Every booth below is available as a custom rental for GWCC, designed, built, delivered, installed and dismantled by our own team. Same designs are available to buy outright.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.

100% custom, rent it or buy it, same design and build quality. Install & dismantle included.
Keep going
Preliminary quote within 1 hour. Detailed quote within 24 hours. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.
10-minute call for projects of $10,000 USD and up. 30-minute design strategy session for projects of $30,000 USD and up.