Traction X

Planning and timelines

What is an electrical order?

An electrical order is the form that tells the show where to put power in your booth, what amperage you need and when you will pay the advance rate. The venue or the official contractor supplies the electricity.

Why it matters for exhibitors

Lights, screens and chargers do nothing without a drop in the right place, under the flooring, before the carpet goes down. Ordering it on move-in day is the expensive version.

How Traction X handles it

Traction X calculates the booth load, draws the drop locations and helps file the electrical order. We do not replace the show contractor. Power is confirmed in the written quote and billed by the venue or the GSC.

Traction X serves all major US and Canadian convention center cities.

Do I need a show contractor for electrical?

Yes. Hall electrical is ordered from the official contractor or the venue electrical provider. Your exhibit house cannot pull power from a house panel.

What goes on the electrical floor plan?

Each drop, its amperage and the device it feeds, located where the install crew can reach it. Traction X draws that plan from the booth design.

Is electrical included in the booth rental?

No. It is a venue charge, confirmed in the Traction X quote so you can see it, and invoiced by the show. Delivery and install of the booth are what the booth price includes.

When should the electrical order be placed?

Before the advance deadline in the exhibitor kit. Traction X tracks that date on managed projects. The deadline tracker is available if you are placing orders yourself.

Get a quote

Preliminary quote within 1 hour, detailed quote within 24 hours. Tell us the show, the footprint and the dates.

10-minute call for projects of $10,000 USD and up. 30-minute design strategy session for projects of $30,000 USD and up.