Logistics checklist
Trade Show Shipping
Checklist
Shipping and delivery are included in a Traction X booth. This is the list we work before the crates leave the shop: where they ship, how they are labeled, and how they come home.
Short answer
Ship to the advance warehouse when the window is open, so the crates are on your space for move-in. Label every piece, keep a copy of the paperwork with the crew, and file the outbound paperwork before teardown starts. Shipping is included in the booth price.
Checklist · 8 min read
Advance warehouse or direct to the hall?
| Advance warehouse | Direct to the hall | |
|---|---|---|
| Timing | Ships days ahead and is on the space for your move-in | Must arrive inside a narrow window |
| Risk | Low. The freight is already in the building queue | A dock queue can hold the install crew |
| Best for | A first show at that hall, or a late design approval | A repeat show with a known crew and a firm schedule |
Crating and labeling
Before it ships
- Number the pieces (1 of 6, 2 of 6) on all four sides and the top.
- Show name, booth number, exhibiting company and target move-in date on every label.
- Remove old show labels. A stale label is the usual reason freight goes to the wrong booth.
- Photograph each crate packed and closed.
Paperwork that travels
- Piece count that matches the labels.
- Certificate of insurance if the venue asks for one.
- A printed packing list in crate 1 and a copy with the lead installer.
After the show
Before teardown
- File the outbound paperwork at the service desk before the crew starts packing.
- Confirm empty crates are back at the booth before the carrier window.
- Share the pickup window with the installers.
While you pack
- Photograph damage before it goes into a crate.
- Pack to the same piece count as the inbound shipment.
- Keep the signed outbound copy with the crew, not inside a crate.
Get a quote in 1 hour
Preliminary quote within 1 hour. Detailed quote within 24 hours. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.
10-minute call for projects of $10,000 USD and up. 30-minute design strategy session for projects of $30,000 USD and up.
FAQ
Frequently asked
Is shipping included?+
Yes. Shipping, delivery, install and dismantle are included in the published booth price.
Should I ship to the advance warehouse or direct to the show?+
Advance warehouse for a first show at that hall, or whenever design approval ran late. Direct to the hall is fine for a repeat show with a known crew and a firm schedule.
How do I label trade show freight?+
Every piece needs the show name, your company name, the booth number, the target move-in date, and a piece count such as 1 of 6. Remove labels from the previous show.
Keep planning
More exhibitor resources
Budgeting tool
Trade Show Budget Template
Every real line item, space, booth, electrical, travel and staff, in one worksheet that totals as you type.
Planning tool
Show Services Deadline Tracker
Enter your show date and get every order-by date that costs real money if you miss it, exportable to your calendar.
Production reference
Booth Graphic File Specs
Bleed, safe area, resolution and colour profile for every panel type we print, plus finished sizes by footprint.
Business case tool
Trade Show ROI Calculator
Turn booth spend into cost per lead, break-even deal count and projected pipeline, the page you forward to finance.
Get a quote in 1 hour
Anything you see online is a starting range only. Send us your show, footprint and dates. Preliminary quote within 1 hour. Detailed quote within 24 hours. Portables and Rescue Booth Builds in as little as 2 weeks. Standard lead time for all items is 3 months. Large custom builds: 4 months or more recommended.
